Télécharger Imprimer la page

Abus TERXON M Instructions D'installation page 107

Publicité

Les langues disponibles

Les langues disponibles

Notes on installation
ALARM CENTRE
Fix the alarm centre to a flat, dry, vibration-free and heat-
resistant surface. The cables for the power supply of the alarm
centre, the alarm zones and the signalling equipment (siren,
flashlight, any external loudspeakers, etc.) should be
inconspicuous, if possible below the surface or in a cable
channel.
• Open the alarm centre housing (loosen the screws with a
Philips screwdriver and remove the cover).
• The alarm centre's PCB is fixed in the housing with three
screws. Loosen these screws and remove the PCB. The
transformer plug can be disconnected from the PCB.
• Use the housing as a template to make drill-marks for the
fixing-screws.
• At the marked positions, drill three holes (min. 4mm Ø,
4.5cm long).
• Fix the alarm centre housing and feed the cables into the
housing.
• Do not tighten the fixing screws until you have connected all
the cables. Replace the PCB and close the housing by
replacing the cover.
CONTROL UNITS
The control units should also be mounted on a flat, dry,
vibration-free surface. The mounting height is important. The
units should be positioned so that all users can easily read the
display and operate the buttons.
• Open the cover of the control unit and loosen the screws
on the base.
• Use the housing as a template to make drill-marks for the
fixing-screws.
• At the marked positions, drill three holes (min. 4mm Ø,
3cm long).
• Connect the control unit to the alarm centre (see next
page).
• Connect the control unit to the external components.
• Make any settings necessary in the control unit.
• Mount the control unit housing on the wall. Replace the
front plate containing the control unit PCB and tighten the
fixing screws.
11
UK

Publicité

loading