Maintenance; General Information - salmson S Serie Manuel D'installation Et Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

is  reached  before  pump  has  primed.  Measure  liquid  temperature  and 
modify alarm and stop trips settings accordingly. 
Theoritically the pump could prime up to 8 meters but lifting height 
 
will  be  limited  to  6  meters  to  take  suction  line  head  losses  into 
account. 
Check that the system available NPSH (NPSH
 
the required NPSH (NPSH
point. 
 
Theoretical priming times (Nominal Dia of pipe = pump nominal dia) : 
Pump size 
Pump speed 
S40 
2900 
S41 
2900 
S45 
2900 
S46 
2900 
S50 
2900 
S51 
2900 
S60 
2900 
S61 
2900 
S63 
2900 
S65 
1450 
S68 
2900 
S80(‐2) 
2900 
S80 
2900 
S83 
2900 
S85 
1450 
S88 
2900 
S88 (210) 
2900 
S100 
2900 
S105 
1450 
S105 
2300 
S105 T114 
1450 
S108 
2900 
S120 
1450 
S150 
1450 
S160 
1450 
S170 
950 
 
Priming time depends on lifting height, length of the suction line, inner 
diameter of suction pipe and specific gravity of the fluid. 
It will be necessary to apply correction factors to know priming time : 
Tt = table with Ha = Hg x d 
Ta = Tt x L/Hg x (DT/DN)² 
 
With : 
Tt : theoretical priming time 
Ha : suction height with specific gravity correction factor 
d : Specific gravity of fluid 
L : total length of suction line 
DT : inner diameter of suction pipe 
DN : pump suction flange nominal diameter 
) is always higher than 
A
) of pump when fluid level is at its lower 
R
Priming time in seconds vs 
suction lift height. [Tt] 
 
21 
47 
78 
135 
27 
57 
93 
153 
12 
22 
35 
47 
13 
23 
17 
29 
46 
83 
19 
34 
55 
87 
19 
29 
42 
56 
10 
15 
21 
29 
10 
14 
19 
30 
58 
83 
186 
14 
19 
26 
36 
49 
62 
74 
21 
53 
95 
132 
14 
20 
26 
31 
32 
63 
100 
152 
11 
18 
11 
15 
19 
30 
38 
45 
38 
69 
110 
167 
13 
17 
21 
30 
62 
110 
189 
10 
14 
18 
22 
10 
18 
31 
50 
33 
71 
117 
176 
15 
26 
41 
63 
28 
51 
85 
129 
 
9
MAINTENANCE 
9.1 GENERAL INFORMATION 
Only  properly  trained  and  skilled  staff  should  undertake 
maintenance operations. 
 Only  authorized  personnel  should  undertake  maintenance  on 
ATEX  certified  equipments.  Make  sure  to  avoid  creation  of 
explosion hazard while proceeding to maintenance in a ATEX zone. 
All technical documents delivered with the pump should be known 
and should be available near the pump. 
The maintenance crew should be informed about the risks linked to the 
use of the pump and to the pumped fluids before they can start working 
on  the  equipment  (dangerous  products,  fluid  and  pump  temperature, 
pressurized  parts,  ...).  They  should  be  equipped  with  all  appropriated 
 
individual safety protections (glasses, gloves, ...) and should respect local 
 
industrial and security rules. 
62 
Pump  contains  a  part  of  pumped  fluid  even  when  it  is  at  a 
34 
standstill.  Drain  and  flush  pump  casing  with  care  before  starting 
 
pump disassembly. 
155 
 
77 
Appropriate lifting devices should be available to help personnel moving 
41 
heavy loads. 
33 
 
 
The maintenance area must be clearly identified. Install warning boards 
38 
with the words « WARNING : machine under repair ! »  on the pump and 
95 
on the control cabinet. 
 
 
39 
Any  work  on  the  machine  must  be  performed  when  pump  is 
 
stopped.  Prior  to  any  maintenance  or  repair  work  the  motor 
26 
should  be  electrically  isolated  and  secured  against  uncontrolled  start. 
20 
Lock the main switch open and disconnect circuit breaker. Withdraw the 
54 
fuses if any. 
 
 
25 
WARNING : electrical equipments that must be powered on during the 
 
maintenance work or pressurized equipments must be clearly identified. 
 
27 
End of maintenance operations : all protective parts that were removed 
95 
before maintenance should be reinstalled and all security devices should 
 
be reactivated. Pump surrounding area should be cleaned. 
93 
 
181 
9.2 MAINTENANCE 
INSPECTIONS SCHEDULE 
It is recommended to build up a maintenance and inspection plan 
to  ensure  a  reliable  use  of  pump  and  to  reduce  malfunctions 
hazards. Following check points should be included in this maintenance 
plan : 
 Check state and working of securities and auxiliary systems, 
 Check and adjust gland packing (if any) for visible leakage, 
 Check for any leaks from pump gaskets and flanges seals, 
  Check  lubricant  level  and  aspect  of  oil  (oil  lubricated  bearings)  in 
bearing bracket, 
  Check  running  time  and  replacement  frequency  of  lubricants  /  ball 
bearings, 
  Check  the  bearing  bracket  housing  surface  temperature  on  ball 
bearings area, 
 Check dirt and dust is removed from pump and motor , 
 Check coupling alignment (depending on pump variant), 
  Check  if  there  is  unusual  noises  (cavitations,  hissing,  purring,  ...)  or 
excessive vibrations. 
17 
  ENGLISH  
AND 
PERIODIC 
 

Publicité

Chapitres

Table des Matières
loading

Table des Matières