Operating manual
Unscrew the two front panel screws and release the
cover towards the front of the gun.
Slightly unscrew the two rod clamping screws.
If you change the rod, remove the rods by pulling
on them, then put in new ones.
Adjust the length of the gun rods according to the
type of welding accessory used (dimension at the
end of the rods and the edge of the flanges).
Accessory
Ring holder (059610)
ArcPull Rivet box1 350 – 24kN
(064584)
ArcPull Rivet box2 350 – 50kN rivet
extraction box (064584)
M4 to M8 stud holder box (068339)
Ceramic adapter Ø6 and Ø8 (075979)
Difficult Access M4 to M8 stud holder
box (070813)
Tighten the two rod clamping screws.
Reposition the cover at the front of the gun and
retighten the two retaining screws.
6.2. SETTING A STUD HOLDER / INSULATION NAIL HOLDER
Note 1: Stud holder setting for rivet pull rod is specific. It is detailed in the paragraphs (see §6.4 and §6.5).
Note 2: In the case of installing an insulation nail, no adjustment is necessary. Insert the insulation nail up to the stop
of the nail holder.
Translation of the original
instructions
L (mm)
120mm
55mm
75mm
120mm
120mm
75mm
L
ARCPULL 350
45