Assembly And Installation - Yamaha YZ250F 2004 Manuel D'atelier Du Proprietaire

Masquer les pouces Voir aussi pour YZ250F 2004:
Table des Matières

Publicité

HANDLEBAR
EC5B5000

ASSEMBLY AND INSTALLATION

Handlebar
1. Install:
• Handlebar 1
• Handlebar upper holder 2
• Bolt (handlebar upper holder) 3
NOTE:
• The handlebar upper holder should be
installed with the punched mark a forward.
• Install the handlebar so that the marks b are
in place on both sides.
• First tighten the bolts on the front side of the
handlebar upper holder, and then tighten the
bolts on the rear side.
2. Install:
• Left grip 1
Apply the adhesive to the handlebar 2.
NOTE:
• Before applying the adhesive, wipe off
grease or oil on the handlebar surface a
with a lacquer thinner.
• Install the left grip to the handlebar so that
the line b between the two arrow marks
faces straight upward.
5 - 44
CHAS
28 Nm (2.8 m · kg, 20 ft · lb)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Yz250ft 2004

Table des Matières