Care, Maintenance And Disposal; General Remarks; Every Start-Up; Every 2 Months - Fronius TransTig 2200 Instructions De Service

Masquer les pouces Voir aussi pour TransTig 2200:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Care, maintenance and disposal

General remarks

Under normal operating conditions the power source requires only a minimum of care
and maintenance. However, it is essential that certain important points are observed to
ensure the welding machine remains serviceable for many years to come.

Every start-up

-
-

Every 2 months

-
-

Every 6 months

-
Dispose of in accordance with the applicable national and local regulations.

Disposal

Warning! An electric shock can be fatal. Before opening up the machine
-
Switch the mains switch "OFF"
-
Unplug the machine from the mains
-
Put up an easy-to-understand warning sign to stop anybody inadvertently
switching it back on again
-
Using a suitable measuring instrument, check to make sure that electrical-
ly charged components (e.g. capacitors) have been discharged
Check mains plug, mains cable, welding torch, interconnection cable assembly and
bondings for damage
Check that there is a gap of 0.5 m (1.6 ft.) all around the machine to ensure that
cooling air can flow and escape unhindered.
Note! Air inlets and outlets must never be covered, not even partly.
Optional: clean air filter
Dismantle machine side panels and clean machine inside with dry reduced com-
pressed air
Note! Risk of damage to electronic components. Do not bring the air nozzle too
close to the electronic components.
If a lot of dust has accumulated, clean the cooling air ducts.
47

Publicité

Table des Matières
loading

Table des Matières