Marking The Am And Ah Axes; Drilling The Pillars - SOMFY SGS LINE Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1.2 Mounting the pillar brackets

Marking the AM and AH axes

1.
Transfer dimension B onto the pillar using the hinge axis and mark
a vertical axis AM on the pillar.
2.
Mark the horizontal axis AH on the pillar, halfway up the reinforce-
ment.
Check before proceeding to the next step
Have you marked the AM and AH axes?

Drilling the pillars

1
AH
Align the markings made on the bracket with the AH axis and
align the edge of the bracket with the AM axis.
Note: The markers marked on the bracket are underneath the
oblong holes.
2
Check that the bracket is horizontal, then mark the mounting
holes for the bracket.
AH
Position the bracket in direction e or E defined in step 2 of
measuring the dimensions (see page 12).
Le -hand pillar
Pilier gauche
Sens E
Sens e
Direction E
Direction E
ou
or
Take care to ensure the bracket is fitted the right way up.
Correct
orientation
3
Drill 3 holes in each pillar in the locations marked (see page
11 for the drilling diameter corresponding to suitable
hardware).
EN - SGS LINE installation and operating guide - SOMFY
Installation
Right-hand pillar
Pilier droit
Sens e
Sens E
Direction E
Direction E
ou
or
Incorrect
orientation
1
13

Publicité

Table des Matières
loading

Table des Matières