SOMFY SGS LINE Manuel D'installation page 49

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4
5
6
7
8
9
10
Check before proceeding to the next step
Have you checked that the cylinders are perfectly horizontal?
Push the gate leaf mounting bracket against the gate leaf
reinforcement. Check that the cylinder is level.
Make the markings on the sides of the gate leaf mounting
bracket.
Unclip the unlocking mechanism, then remove the cylinder
from the gate leaf mounting bracket.
Reposition the gate leaf mounting bracket then mark the
mounting holes in the centre of the oblong holes.
Drill the gate leaves with a diameter of 8.
8
Secure the gate leaf mounting bracket to the two points on
the gate leaves using screws suited to the reinforcement
material and the washers (j) supplied.
The washers (k) provided must be fitted.
Fit the cylinder. Clip the unlocking mechanism on the catch to
secure it.
EN - SGS LINE installation and operating guide - SOMFY
Installation
1
15

Publicité

Table des Matières
loading

Table des Matières