Electrical pre-equipment

Cables required

• Power supply: 3 x 1.5 mm² cable or 3 x 2.5 mm² for outdoor use (type H07RN-F as minimum requirement).
• Connection between the motors: 2 x 1 mm² cable; fit an IP 55 junction box to protect the connection between the cable leaving the motor
and the extension which goes to the control unit.
• Linking of cells: 2 x 0.75 mm² cable;.
Provision must be made for the power supply
cable to be fed through in accordance with
the electrical standards in force in the country
of use.
Motor cable
Extension to the control
unit
Cable feed
• Underground cables must be equipped with a protective sheath with a sufficient diameter to contain all the cables.
• Fit a 230 V electrical input as close as possible to the control unit.
Cables required
If a cable conduit cannot be made, use a cable grommet which will withstand the weight of vehicles (ref. 2400484).
Details of the wiring are given in the section entitled "Wiring the accessories" page 22.
10
EN - SGS LINE installation and operating guide - SOMFY
Flexible ICT sheath
The cables are not supplied with the product.
230V power
supply