SOMFY SGS LINE Manuel D'installation page 51

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3
4
5
6
Secure the bracket to the pillar/wall.
Position the base of the unit to mark the 2 mounting points at
the bottom of the unit.
Remove the base of the unit then drill the pillar/wall. The
drilling diameter is to be defined based on the type of screws
used for mounting (see page 11).
Secure the base of the unit to the pillar/wall: 1 screw (q) to
secure the unit to the bracket + 2 screws to secure the unit to
the pillar/wall.
EN - SGS LINE installation and operating guide - SOMFY
Installation
1
17

Publicité

Table des Matières
loading

Table des Matières