Instruction / hand-over
The chapter "Safety instructions" must be heeded! (p. 2)
Commissioning is carried out by a specialised firm or by an
authorised KESSEL agent (at an additional charge).
The following persons should be present for the hand-over:
- Person authorised to perform the acceptance on behalf of
the building owner
- Specialised firm
In addition, we recommend the participation of operating per-
sonnel/operator, waste disposal contractor
Overview instruction:
5. 1. Making the plant ready for operation
5. 2. Checking the plant
5. 3. Instruction based on the installation and operating in-
structions
5. 4. Drawing up the handover certificate. (see chapter 13)
Once the instruction is completed, the plant must be made
ready for operation.
5.1 Making the plant ready for operation
Prior to commissioning, the plant must be completely cleaned
(including inlets and drains); solids and coarse particles must
be removed.
5. Commissioning
Both chambers of the plant must be filled UP with clear water
(see page 110).
Display/indicator panel
Movement keys/direction keys for guidance
through the program menu
Enter key/OK key
Back key/ESC key
Pilot lamp indicating readiness for operation
Pilot lamp for malfunction message
Power supply cable for control unit
Mains connection compressor
Connection compressed air sensor (optiional
accessoires)
Connection options for external signal
generator
Connection for valve block
Connecting socket for floating contact
0.
System start
Systemstart
Systemdiagnose
System diagnostic
0.1
0.2
0.3
0.4
System information
1.5
Systeminfo
Uhrzeit:
20:45
Time:
20:45
Schwimmer: S1
S2
Floater: S1
Events
Main power failure
Ereignisse:
Netz ausfall
Normal phase
Normalphase
114
Language
Sprache
deutsch
französisch
German
englisch
French
English
Date/Time
Datum/Uhrzeit
Datum
Date
01.01.2009 Uhrzeit
01.01.02009 Time
12:00
12:00
Classes
Klassen
C
D
Nominal Size
Nenngrößen
EW4
EW6
EW8
EW10
EW24