5
Commissioning
Preparing commissioning
Set up water supply if necessary.
Fill the separator with cold water up to the static level (height of the outlet), unless this has already been carried out.
Have a general inspection carried out (during initial commissioning and then every 5 years).
016-185_01
23 / 82