5.
Commissioning
▶ Check whether the steps explained in the installation chapter have been
properly followed.
▶ Clear any building waste from the tank if necessary.
▶ Establish the power supply for the system. If applicable, lift the float switch
to check whether the submersible pump starts up automatically.
✓ With connecting the connection cable(s) to the power supply, the system is
ready for operation.
✓ If a control unit is fitted, its initialisation starts automatically (separate
instructions).
52
Installation and operating manual
016-059