5
Commissioning
Check whether the steps explained in the chapter on
assembly have been carried out correctly.
Clear any building waste from the tank if necessary.
Connect the system to the power supply. Lift the float
switch to check whether the submersible pump starts
automatically.
✓ Connecting the connection cable(s) to the power supply
switches the system on.
016-168
CAUTION
Make sure that the emergency closure is in the
OPEN position (normal position). If the emergency
closure is closed, there is a risk of flooding by own
consumers.
Close the emergency closure (Lift&Lock)
Pull the lever for the emergency closure vertically
upwards.
✓ The lever for the emergency closure can be heard to dis-
engage.
Turn the lever for emergency closure as far as it will go.
✓ The emergency closure is closed. The flow of wastewater
is prevented in both directions.
Installation and operating manual
25 / 92