Maintenance Checklist - Kessel InnoClean PLUS Instructions De Montage

Masquer les pouces Voir aussi pour InnoClean PLUS:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 47
KESSEL InnoClean PLUS Maintenance Log Book
gem. DIN 4261 -100
Name of operator:
Typ der Anlage:
Treatment class:
Number of home occupants:
System components / function
General visual inspection
Chamber installation / situation
Compressor installation
Pressure hose /cable installation (no kinks)
No ground / surface water entering system
Ventilation hose
Control unit
Check entries in control unit Log Book
Check warnings which have been displayed
Sludge transfer to tank 1 - on
Test solenoid valve
Sedimentation tank (tank 1)
Air hose connection / lifter functioning
Inlet pipe free of blockages
Is floating sludge present?
Has the system overflowed?
Treatment tank (tank 2)
Aeration hose operational
Air / oxygen supply to aerator hose functioning
Float switch functions at max height.
Float switch functions at min height
Float switch has full range of movement
Is floating sludge present?
Sampling chamber
Clean and rinse sampling chamber
Compressor installation
Filter clean and free of blockages
Membrane replacement required
Compressor temperature warm to the touch
Warning lamp off
Furthermore, the filter and the membrane must be replaced once every 12 months by trained service personnel.
In addition, the valve blocks must also be checked for soiling and replaced if necessary.
Hours of operation
Compressor operation for pumping treated water o
Compressor operation for transfering wastewater f
Compressor operation for aeration
Total time of InnoClean operation
Levels
Sludge depth
Primary sludge depth
Fluid level activated chamber (tank 2)
Activated sludge volume
Wastewater analysis (Parameter soweit messbar)
COD (mg/l)
BOD
(mg/l)
5
NH
-N Ammonia (mg/l)
4
O
Oxygen (mg/l)
2
pH-value

14. Maintenance Checklist

Checked
oblem / defe
yes
no
yes
Time (hours)
NO
-N Nitrate (mg/l)
3
NO
-N Nitrite (mg/l)
2
N
ges.,anorg
PO
-P Phosphate (mg/l)
4
Electrical conductivity (μS)
Location:
Serial number:
Water tightness test performed on:
Date commissioned:
no
Evaluation / effect
Sludge transfer (to tank 1)
Last sludge transfer on:
Activate manual sludge transfer:
total nitrogen (mg/l)
132
Comments
changed to
no
yes, up t
Odor
Color
Wastewater temperature tank 2 (°C)
Air temperature (°C)
Settleable solids

Publicité

Table des Matières
loading

Table des Matières