Commissioning - Kessel EasyClean free Auto Mix Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
5

Commissioning

Preparing commissioning
Set up water supply if necessary.
Fill the separator with cold water up to the static level (height of the outlet), unless this has already been carried out.
Have a general inspection carried out (during initial commissioning and then every 5 years).
switch the control unit on.
Connect the power supply.
Set the main switch to the "ON" position.
✓ Control unit starts automatically.
✓ The control unit is initialised during the initial commissioning.
5.1
Initialisation of the control unit
During initialisation, the following input is expected:
|Language|
|Date / Time|
|Nominal size |
|Standard |
|Number of pumps|
Language
► Press OK.
► Use the cursor keys to select the language and confirm
with OK.
✓ Menu
appears.
|Date/Time|
Date / Time
► Set the respective flashing figure in date and time and
confirm with OK.
✓ Menu
|Nominal size|
Nominal size
► Select appropriate nominal size and confirm with OK.
The selection affects which program runtimes are stored in the disposal.
menu appears.
|Standard|
Standard
► Select standard suitable for application case and product (here: EN 1825) and confirm with OK.
|Number of pumps|
Number of pumps
► Select
in the menu confirm with OK.
|1 pump|
✓ The initialisation is completed.
Make the settings at the control unit
Adjust the preset filling times and duration of the mixing process in the disposal program to your own requirements.
If applicable, activate accessories in the control unit (e.g. remote control, sonic control).
Set the maintenance date.
Check the functional capability of the electrical accessories.
Perform a functional test, see below.
If automatic switching off of the filling process is required, this can be implemented using the automatic water refill device,
KESSEL EasyFill (Art. No. 919010).
Legionella prevention
Check whether the routing requires regular legionella flushing. If yes, determine the length of the pipe concerned.
016-188_01
appears.
menu appears.
(1)
Arrow but-
tons, OK, ESC
(2)
Display
(3)
Power-LED
(4)
Button, acknowl-
edge alarm
(5)
Alarm LED
(6)
Manual oper-
ation button
35 / 138

Publicité

Table des Matières
loading

Table des Matières