Instruction / hand-over
The chapter "Safety instructions" must be heeded! (p. 2)
Commissioning is carried out by a specialised firm or by an aut-
horised KESSEL agent (at an additional charge).
The following persons should be present for the hand-over:
- Person authorised to perform the acceptance on behalf of the
building owner
- Specialised firm
In addition, we recommend the participation of operating per-
sonnel/operator, waste disposal contractor
Overview instruction:
5. 1. Making the plant ready for operation
5. 2. Checking the plant
5. 3. Instruction based on the installation and operating in-
structions
5. 4. Drawing up the handover certificate. (see chapter 13)
Once the instruction is completed, the plant must be made
ready for operation.
5.1 Making the plant ready for operation
Prior to commissioning, the plant must be completely cleaned
(including inlets and drains); solids and coarse particles must
be removed.
5. Commissioning
Both chambers of the plant must be filled UP with clear water
to a height of 1.20 m.
Display/indicator panel
Movement keys/direction keys for guidance
through the program menu
Enter key/OK key
Back key/ESC key
Pilot lamp indicating readiness for operation
Pilot lamp for malfunction message
Mains power supply cable
Mains connection compressor
Connection compressed air sensor
Connection options for external signal
generator
Connection for valve block
Connecting socket for floating contact
0.
System start
Systemstart
System diagnostic
Systemdiagnose
0.1
0.2
0.3
0.4
System information
Systeminfo
1.5
Time:
20:45
Uhrzeit:
20:45
Floater: S1
Schwimmer: S1
S2
Events
Main power failure
Ereignisse:
Netz ausfall
Normal phase
Normalphase
108
Language
Sprache
deutsch
German
französisch
englisch
French
English
Date/Time
Datum/Uhrzeit
Date
Datum
01.01.02009 Time
01.01.2009 Uhrzeit
12:00
12:00
Classes
Klassen
C
D
Nominal Size
Nenngrößen
EW4
EW6
EW8
EW10
...
EW24