MCS BV 110E Manuel D'utilisation Et De Maintenance page 45

Table des Matières

Publicité

Table of contents
1 - Safety information
2 - Introduction
Preparations before making repairs
Required tools
3 - General specifications
Electrical power supply
Room ventilation
Sizing the heater
4 - Functions of the components
Fuel system
Fuel filter
Fuel filter maintenance
Fuel pump
Solenoid valve
Fuel pump maintenance
Nozzle
Nozzle Maintenance
Ventilation system
Fan
Motor
Air adjustment damper
Flame control system and Ignition system
Flame control equipment
Electrodes
Safety thermostat
Ignition transformer
Electrical system
Electrical diagram and electrical panel
Representation of the electrical panel
Heater functioning diagram
5 - Troubleshooting
Safety requirements
How to use an ohmmeter
Information on diagnostics
Troubleshooting
The motor does not run and the flame does not ignite
The electrodes are often dirty/ignition is delayed
The electrodes make a spark but the motor does not run
The motor starts but the heater does not ignite
The heater ignites, the flame is present, but the heater turns off
If the heater ignites, but lots of smoke is coming out
Table of Contents
24
en
it
de
2
es
3
3
fr
3
4
nl
4
4
pt
4
da
5
5
fi
6
6
6
no
7
8
sv
8
8
pl
9
9
ru
9
10
10
cs
10
11
hu
11
12
sl
13
13
13
tr
14
hr
15
15
lt
16
17
lv
17
17
18
et
19
19
ro
22
23
sk
24
bg
uk
bs
el
zh

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Bv 170eB 360Bv 290eB 230Bv 77e

Table des Matières