CEILING MOUNTING
NB1. The device has to be installed by specialized technicians only
NB2. Always cut off the power supply prior to installation
NB3. Before proceeding with the assembly, ensure the ceiling can bear the application.
The authorized construction materials of the ceiling are concrete and natural stone. Use the
supplied fittings or equivalent ones.
NB4. Maximum applicable load: 70 kg
NB5. Installation is allowed only in spaces provided with electrical plant compliant with the
national legislation in force as regards spaces for medical use
NB6. The lamp without transformer must be powered with low-voltage (12-24Vac o 17-33Vdc)
using a safety transformer (according to IEC/EN 60601-1) with thermal protection or at least
one suitable fuse (T500mAL250V~).
INSTALLATION STEPS
A After having fixed as reference point the
chair centre (A), install at a distance of 650mm
and 150mm, according to the directions given
in the figure.
B. Unfit the flange (7) by removing the nuts (12) and washers (11).
C. By using as guide the flange (1), carry out on the ceiling 4 bores with Ø14 drill.
Fit the expanders (2) in these bores.
D. Take the flange (1). Pass the power cable through the cable gland (5), then push the flange
(1) against the ceiling; do not choke the cable between the flange
(1) and the ceiling. Pass the screws (3) and washers (4) through the 4 bores used as reference
in drilling the ceiling. Lock with the special wrench (installation accessory) the screws (3)
1
E. Connect the power cable to the terminal board (6) (see electrical diagrams)
48
2
5
4
3