Supplying Power; Single-Phase Supply; 2-Phase Supply; Connection To The Machine - Struers TegraPol 21 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Supplying Power

Single-phase Supply

2-phase Supply

Connection to the Machine

TegraPol-21/ -25/ -31/ -35
TegraForce-3/ -5
Instruction Manual
Always remember to switch the power off when installing electrical
equipment.
Check that the mains voltage corresponds to the voltage stated
on the type plate on the back of the machine.
The TegraPol is shipped with 2 types of Mains cables:
The 2-pin (European Schuko) plug is for use on single-phase
connections.
If the plug supplied on this cable is not approved in your country,
then the plug must be replaced with an approved plug. The leads
must be connected as follows:
Yellow/green: earth
Brown:
line (live)
Blue:
neutral
The 3-pin (North American NEMA) plug is for use on 2-phase power
connections.
If the plug supplied on this cable is not approved in your country,
then the plug must be replaced with an approved plug. The leads
must be connected as follows:
Green: earth
Black:
line (live)
White: line (live)
Both cables are on the other end equipped with an IEC 320 cable
connector that has to be connected to the TegraPol.
The output voltage from this cable is 200 – 240V and not 110V.
DO NOT use this cable to connect equipment that use a 110V power
supply. Failure to adhere to this may result in material damage.
DANGER!
The machine must be earthed
IMPORTANT
WARNING!
9

Publicité

Table des Matières
loading

Table des Matières