Télécharger Imprimer la page

Putting The Unit Into Operation - Tecno-gaz TYGI 350 B Manuel D'utilisation

Publicité

Les langues disponibles

Les langues disponibles

INSTRUCTIONS FOR USE

7 PUTTING THE UNIT INTO OPERATION

Warning – disinfection of new dental unit before its first use
Before putting the unit into operation, your service technician must carry out disinfection of waterlines of
instruments.
switch on the compressor and let it get pressurized with air
check the instruments for their positions
turn on the main switch
the indicator light of the main switch goes on and the following initial screen is displayed briefly:
After that the main screen is displayed. Grayed options are unavailable.
24.AUG
12:12
DR.SMITH
The unit is connected to the distribution of air. After audible signal (short-long tone), the unit is ready to work.
While the unit is being in process of turning ON:
no instruments should be taken off its holder,
the foot controller shall be in the rest position and
no button on the keyboard should be pressed
UM_EN_TYGI350B_2018-09_ver1.0
TYGI 350 B
TYGI 350 B
9 / 49

Publicité

loading

Ce manuel est également adapté pour:

Ca001tyg