Télécharger Imprimer la page

Johnson Controls 3G4010CF Manuel D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

enabled). For Level P2, the working communication path shall report the failure of the other
channel within 240 seconds.
For ULC Commercial Fire Monitoring Installations the 3G4010CF/LE4010CF can be used in the
following configurations:
Active communication system with 180 seconds supervision (Heartbeat sent to signal receiving
centre every 90 sec).
Passive communication system in conjunction with a another communication path (e.g. DACT)
(there is no heartbeat sent in this configuration, only periodic test transmission ). Alarm
signals must be sent simultaneously over both communication paths (Cellular and DACT).
Every 24 hours, a test transmission must be sent to the signal receiving centre over each
communication path. Each communication path shall be monitored for integrity (DACT shall
have line monitoring enabled and shall have cellular connection supervision enabled).
For ULC Commercial Burglary Monitoring Installations the 3G4010CF/LE4010CF can be used in the
following configurations:
Active communication system with 180 seconds supervision and heartbeat sent to signal
receiving centre every 90 sec.
Passive communication system line security P1 (single communication channel) or line security
P2 (used as backup in conjunction with another communication path (e.g. DACT)). There is
no heartbeat sent in this configuration, only periodic test transmissions. Every 24 hours, a
test transmission must be sent to the signal receiving centre over each communication path.
Each communication path shall be monitored for integrity (DACT shall have line monitoring
enabled and shall have cellular connection supervision enabled). For Level P2 the working
communication path shall report the failure of the other channel within 240s.
For Commercial Fire Monitoring Installations, the 3G4010CF/LE4010CF can be used in the following
configurations:
Standalone communicator, single communication technology - 5 minute supervision (heartbeat
sent to supervising station every 90 seconds).
Back-up communicator line for a DACT (dual communication technology, no heartbeat sent).
Alarm sig-nals must be sent first over the primary communication path (DACT) and then, if
this is known to have failed, over the secondary communication paths (other transmission
technologies)
-
Primary: Compatible listed control unit's land line to central station (primary).
-
Secondary: 3G4010CF/LE4010CF transmission through wireless network to central station.
Every 24 hours, a check-in signal must be sent to the central station over the primary dialer. The
3G4010CF/LE4010CF sends a heartbeat test transmission to the supervising station every 24 hours.
Each com-munication path shall be monitored for integrity (DACT shall have line monitoring
enabled and 3G4010CF/LE4010CF shall have cellular connection supervision enabled).
Power for model LE4010CF shall be provided by one of the two compatible power supplies:
Mircom Model – DTC-300A(W)(R), digital alarm communicator transmitter.
Simplex control panel 4100U with converter module 4100-5152 installed
Note: Wiring between the 3G4010CF/LE4010CF and FACP/Power Supply shall be made in the
same room, in metal conduit and not longer than 20ft.
3G4010CF / LE4010CF Installation manual
7

Publicité

loading

Ce manuel est également adapté pour:

Le4010cf