Télécharger Imprimer la page

Ascaso BARISTA T Manuel De L'utilisateur page 12

Publicité

Les langues disponibles

Les langues disponibles

The power supply cable must be connected to the connection provided according to
current regulations.
Disconnecting means must be incorporated into the fixed installation in accordance
with the installation regulations.
ATTENTION!
It is essential to connect the machine to a properly grounded connection.
ATTENTION!
The machines model BARISTA T 2/3 groups are configured to make a two-phase
(1/2 GR) / three-phase (3 GR) connection, as indicated in the diagram incorpo-
rated into the connection cable. Special attention must be paid to the connection
of each of the phases as well as the cable corresponding to the neutral of the
electrical system.
R = PHASE/FASE
S = PHASE/FASE
T = PHASE/FASE
N = NEUTRAL/
12
MAN.31 V13 MANUAL BARISTA T 2023_EN_ES_DE_FR.indd 12
MAN.31 V13 MANUAL BARISTA T 2023_EN_ES_DE_FR.indd 12
Machine code Machine number
Model
Cicles
Voltage
Boiler pressure
Boiler capacity
BL = BLUE/AZUL/BLU/
BLAU/BLEU
YG = YELLOW-GREEN/
AMARILLO-VERDE/
VERDE GIALLO/
NEUTRO
GELB-GRÜN/JAUNE-VERT
Power
Current rate
Manufacture date
BR = BROWN/MARRÓN
MARRONE/BRAUN/MARRON
BK = BLACK/NEGRO/
NERO/SCHWARZ/NOIR
GR = GREY/GRIS/GRIGIO/
GRAU/GRIS
18/10/2023 11:23:26
18/10/2023 11:23:26

Publicité

loading