4.2.2 Cable gland connection
Easy connection of the terminal box:
Remove the 4 self-cutting screws to open the cover of
the terminal box.
The connections of the terminals are shown in figure
4.2.
Connect the external position setpoint signal and
power supply wires to the terminals (according to the
PG-terminal assignment).
Connection of terminals (with cable glands)
Terminal
Assignment
1
Setpoint +
2
Setpoint GND
5
Power supply +
6
Power supply GND
NOTE
Further installation procedure, see chapter 5.
Once activated, the Top Control Continuous will work and the necessary configuration and self-calibration operations of the
Top Control Continuous will have to be performed (Fig. 4.4).
102
4.2.3
Terminals
Fig. 4.2: TopControl Terminals
External connection
1
+ (0/4..20 mA or 0..5 / 10V)
2
GND
5
24 V DC ± 10 %
Residual ripple 10 %
6
Operating instructions no. 800607