Initial Commissioning; Pneumatic Connection; Electrical Connection; Multipol Connection - Burkert 8630 Instructions De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4

INITIAL COMMISSIONING

NOTE
This section allows you to perform the quick commissioning of the Top Control Continuous. The not essenti-
al additional functions are not described in this section. See chapter 5 and 6 for complete explanations
about commissioning and the functions available.
4.1

Pneumatic connection

Install the valve according to the specific requirements.
Connect the air supply (3..7 bar, instrument air, oil, water and duster) to port 1.
Mount the exhaust air pipe or noise reducer on port 3.
4.2

Electrical connection

4.2.1 Multipole connection
Connect the external position setpoint signal to the
circular connector M16.
Connection of the circular connector M16:
Pin
Assignment
B
Setpoint +
A
Setpoint GND
Connect the power supply to the circular connector M12.
Connection of the circular connector M12 :
Pin
Assignment
1
+ 24 V
2
not connected
3
GND
4
not connected
Top Control Continuous
M16
Fig. 4.1: TopControl with multipole connectors
External connection
(0/4..20 mA)
B
or
0..5 / 10V
A
External connection
1
3
+ (0/4..20 mA) or 0..5 / 10V
GND
24 V DC ± 10 %
Residual ripple 10 %
M12
101

Publicité

Table des Matières
loading

Table des Matières