Installing The Pulse Control (Water Meter); Installing The Standard Signal Control; Installing The Control Via The Metering Lock - Ecolab Elados EMP IV E60 Notice Technique

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing the pulse control (water meter)

7.2.4.2
Fig. 7.20

Installing the standard signal control

7.2.4.3
Fig. 7.21

Installing the control via the metering lock

7.2.4.4
The metering disable system must have been activated in the menu (see section 10.3.7)
NOTE
and is available in all modes of operation.
Fig. 7.22
417101799_EMP_IV_E60.docx
6
+
7
=
pulse input with potenial free contact
Terminal Assignment
6
Relay input pulse
GND ( ┴ )
7
5
+
6
+
7
= Pulse input with electronic switch (NPN)
Terminal Assignment
5
5 V, DC
6
Relay input pulse
GND ( ┴ )
7
The minimum pulse- or pause time is 15 ms.
9
+
10
= Standard signal input
Terminal Assignment
9
0/4...20 mA +
10
0/4...20 mA -
8
+
7
= Input metering lock with potential-
free contact
Terminal Assignment
8
Relay input metering lock
GND ( ┴ )
7
5
+
8
+
7
= Input metering lock with electronic
switch (NPN)
Terminal Assignment
5
5 V, DC
8
Relay input metering lock
GND ( ┴ )
7
- 80 -
Rev. 9-06.11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp iv e60plus

Table des Matières