Connector Assignment Of Slot Ii (4-Pin Only E20) Input For Pulse Signal And Metering Lock; Installing The Pulse Control (Water Meter, Only E20) - Ecolab Elados EMP KKS E10 Notice Technique

Masquer les pouces Voir aussi pour Elados EMP KKS E10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2.4
Connector assignment of slot II (4-pin only E20)
input for pulse signal and metering lock,
Fig. 7.10
Remove the protective cap
Mount the connector plug according to the connector assignment.
ATTENTION

7.2.4.1 Installing the pulse control (water meter, only E20)

Fig. 7.11
417101338_EMPKKS.doc
1: output 5 V (loadable with max. 50 mA)
2: pulse input
3: metering lock
4: GND ( ┴ )
(plug assignments: see also chapter 12.5.2)
Only use a connector plug from our product range! (included in the delivery scope)
51
Rev: 08-01.10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elados emp kks e11Elados emp kks e20

Table des Matières