Maintenance
9.4

Installing the dosing valve in the correct position

WARNING!
When installing the valves, ensure that the flow direction is correct.
NOTICE!
It is essential that the tightening torques given below are observed, firstly to
ensure the leak-tightness of the system and secondly to ensure the integrity of
the thread.
The tightening torques of the metering head screws are given on an adhesive
label that is affixed to the pump head.
Tightening torque of the suction/pressure valves:
Pump head size
Tightening torque
9.5

Changing the valve cartridges (V3 type)

When changing the 'V3 valve cartridges,' ensure that they are inserted in the
correct position.
417102264 Rev. 5-01.2019
The direction of flow is marked by an impressed arrow on the suction/
pressure valves.
5 l/h and 11 l/h
2 ± 0.2 Nm
1. Lower valve cartridge V3
S suction side -> suction valve
56
5 l/h and 11 l/h
2,8 ± 0.2 Nm
5 l/h and 11 l/h
4 ± 0.2 Nm