Step 1 Remove Packaging; Step 2 Install Water Line; Step 3 Install Side Panels - Monogram ZKFN Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions - Flush Inset Installation for

STEP 1 REMOVE PACKAGING

WARNING
is much heavier at the top than at the bottom – be careful
when moving. When using a hand truck, handle from side
only.
AVERTISSEMENT
basculement
Le produit est beaucoup plus lourd en haut
qu'en bas. Il faut être prudent lors des déplacements. Si un
diable est utilisé, il faut soulever le réfrigérateur sur le côté
seulement.
ADVERTENCIA
El producto es mucho más pesado en su parte superior que en
su parte inferior – tenga cuidado al moverlo. Al usar un carro
manual, sosténgalo de costado únicamente.

STEP 2 INSTALL WATER LINE

Connect to potable water supply
WARNING
only.
AVERTISSEMENT
alimentation d'eau potable seulement.
ADVERTENCIA
Realice la conexión a un suministro
de agua potable únicamente.
• A cold water supply is required for automaticicemaker
operation. The water pressure must be between 40 and
120 p.s.i.
• Route 1/4" OD copper or SmartConnect
between house cold water line and the water connection
location.
• Tubing should be long enough to extend to the front of
the unit. Allow enough tubing to accommodate bend
leading into the water line connection.
NOTE: The only Monogram approved plastic tubing is
supplied in the SmartConnect
Do not use any other plastic water supply line because
the line is under pressure at all times. Other types of
plastic may crack or rupture with age and cause water
damage to your home.

STEP 3 INSTALL SIDE PANELS

Skip this step when not using side panels
If you are using 1/4" (0.63 cm) side panels, they should
be inserted into the case trim.
31-1000454 Rev. 0
All-Refrigerator and All-Freezer
Tip Over Hazard.
Risque de
Riesgo de Caída
Raccordez l'appareil à une
plastic tubing
Refrigerator Tubing kits.
• Carefully cut banding at the top
Product
and bottom, remove outer carton.
• Slide out back corner posts (2).
• Slide carton off top of cabinet.
NOTE: IT IS NOT NECESSARY TO
LAY CABINET DOWN IN ORDER
TO REMOVE SKID!
NOTE: DO NOT ATTEMPT TO
ROLL UNIT OFF SKID.
• The unit is secured to the skid with 4 slotted tie-down
straps. Remove the four 5/16" bolts from the base
channels in the tie-downs.
• Remove toekick and set aside for final installation.
• Lift the unit off the skid with an appliance dolly. Handle
from the sides.
• Remove the four 7/16" bolts securing the tie-down
brackets to the skid.
SmartConnect
Kits are available in the following
lengths:
2' (.6 m)
WX08X10002
8' (2.4 m)
WX08X10006
15' (4.6 m) WX08X10015
25' (7.6 m) WX08X10025
Shut off the main water supply.
Turn on the nearest faucet long enough to clear the line
of water.
• Install a shut-off valve between the icemaker water
valve and cold water pipe in a basement or cabinet.
The shut-off valve should be located where it will be
easily accessible.
• Turn on the main water supply and flush debris. Run
about a quart of water through the tubing into a bucket.
Shut off water supply at the shut-off valve.
NOTE: Saddle type shut-off valves are included in many
water supply kits. Before purchasing, make sure a saddle
type valve complies with your local plumbing codes.
NOTE: Commonwealth of Massachusetts Plumbing
Codes 248CMR shall be adhered to. Saddle valves
are illegal and use is not permitted in Massachusetts.
Consult with your licensed plumber.
Fasten the panels to the unit with stick-on hook and loop
fastener strips before setting unit in place.
51
Refrigerator Tubing

Publicité

Table des Matières
loading

Table des Matières