Installation Instructions - Flush Inset Installation for
French Door Bottom Freezer Refrigerator
STEP 5 ANTI-TIP PROCEDURE (cont.)
• Cut a 1" (2.54 cm) x 4" (10.16 cm) block,
35" (88.9 cm) long.
• Measure and mark under the soffit, 5-1/4"
(13.33 cm) from the front edge of the
cabinet.
• Secure the wood block to under the
soffit. From the bottom of the block to
the finished floor should measure 84"
(213.36 cm). See the illustration.
• The kit supplied with the unit contains 2 lag bolts and 4
toggles with bolts. The wall bracket will be attached to
the wall in 4 places.
• Measure the opening where the unit is to be installed.
Mark the center with a vertical line.
• Measure up 81-1/2" (207.01 cm) from the floor. Mark
this point on the wall.
• Using a level, draw a
horizontal line on the
wall at this height.
• Locate at least 2
studs on the back
wall. Mark these
points on the
horizontal line.
81-1/2"
• Place the bottom
of the wall bracket
with tabs on the
horizontal line. Align
the center notch on
the bracket with the
center line on the
To Floor
wall.
Line on Wall
• The anti-tip wall bracket has a series of holes. Select 2
holes that match with the located studs. Make sure the
holes selected are on the center of the studs. Mark the
wall at these points.
• Mark an additional hole at each end of the bracket.
If one of the studs is closer to the end of the bracket,
mark an additional hole towards the center of the
bracket.
• Drill 1/2" (1.27 cm) holes into the wall board at the
locations marked for the toggles to be mounted (not the
stud markings).
31-1000454 Rev. 0
Center
Two Additional
Hole Locations at
Ends of Brackets
• Drill 3/16" (0.47 cm) holes into wooden studs where
marked. If steel stud construction, drill 1/2" (1.27 cm)
holes into the studs where marked. You will use 2
toggles with the metal studs.
Install Wall Toggles:
The wall toggles and bolts can be ordered as Service Kit
#WR49X10193. Wall toggles are installed in the drywall
and metal studs for stability. Install the wall toggles as
follows:
• Drill 1/2" (1.27 cm) holes at the wall markings made in
the holes at the ends of the wall bracket.
• Hold the metal channel flat against
the plastic straps and slide the
channel through the hole.
• Gently pull back at the ends of the
plastic straps to make the channel
rest flush behind the wall.
• Hold the ends of the straps in one
hand and slide the plastic cap along
the straps until the flange of the cap is
flush with the wall.
• Place your thumb between the plastic
straps and bend up and down to snap
the straps off at the wall.
Install Screws and Bolts:
• Have someone hold the wall
bracket centered in place with each
of the holes aligned with the correct
opening in the bracket and level
with the horizontal line.
• Insert the lag screws through the
bracket and into the stud. Tighten
with a wrench.
• Insert the bolts into the toggle
by hand until snug. Tighten with
a wrench.
17
Wall Bracket
Center
Line On Wall
Wall Studs
Plastic Straps
Metal Channel
Cap
Lag Screw
Anti-Tip Wall Bracket
Drywall or
Steel Stud
Bolt
Anti-Tip Wall Bracket
Wood Stud
Wall Toggle