Electrical Installation - Burkert 8681 Guide Rapide

Masquer les pouces Voir aussi pour 8681:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

11.3

Electrical installation

WARNING!
Risk of explosion in an explosive atmosphere (Zone 2)
` See DANGER note in chapter "8.3" on page 14!
Risk of injury due to electric shock (120 V AC)!
` When setting the position measuring system (Teach-In), do not
contact any live components!
` Before reaching into the system (except for the Teach-In pro-
cedure in a non-explosive atmosphere) switch off the power
supply and secure it to prevent restarting!
` Observe the applicable accident prevention and safety regu-
lations for electrical equipment!
Risk of injury due to improper installation!
` The PE connection must be connected!
` Installation may only be carried out by authorised specialist
personnel and using the appropriate tools.
Cable gland:
Open the housing.
Prepare the connection cable for signals and power supply as
well as for the external initiator, if necessary.
Insert cables through the respective cable glands into the
interior of the housing.
Connect the wires to the terminal strips according to the pin
assignments described in "Fig. 8".
24
english
Type 8681
120 V AC design
Connec-
tion with
status LED
for SV1
Service
interface
Terminal
strip 1
Fig. 8:
Electronic module (120 V AC)
Terminal strip 1 Assignment
PE
Protective earth - protective conductor
L
Power supply 120 V AC
N
S1 OUT
Output position S1
S2 OUT
Output position S2
S3 OUT
Output position S3
S4 OUT
External initiator output S4
Y1
Solenoid valve 1 input V1
Y2
Solenoid valve 2 input V2
Y3
Solenoid valve 3 input V3
Teach-In
buttons T2,
T3, T1
Connections
with status LED
for SV2, 3
DIP switches
for colour
coding the
Top LED
Terminal
strip 2 (exter-
nal initiator)
Conductor
Neutral conductor

Publicité

Table des Matières
loading

Table des Matières