Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
4

ELECTRICAL CONNECTIONS

Complete the installation in line with low voltage regulations and applicable rules.
Use cables with sufficient section, and always earthed.
Check the manufacturer's instructions for all the elements installed.
General connections
O
When installing batteries, ensure they are connected through an external charger
(CHG). Do not connect them directly to the control board.
The ADO01 kit is recommended, consisting of a charger and two 12V /1.2Ah batteries,
as it has been designed for use in this operator.
BAT
(2x12V/1,2 Ah)
ADO01
ADO01 Charger kit (CHG) + batteries (2x 12V / 1.2Ah)
BAT
Batteries
SMF
Signal light card AEPS1-001
SCA
SCA light (24Vdc)
A.T
Total opening operation device
A.P
Pedestrian opening operation device
SG.C
Closing safety device (mechanical strip or
photocell)
SG.A
Opening safety device (mechanical strip or
photocell)
52
Installation Manual
CHG
ST1
ST2
COM
FT1
FT2
FT
Output 24Vdc for photocells (terminals 6 and 7)
AUX
Output 24Vdc (terminals 7 and 8)
DEST
Flashing light (max. 60W)
LIS424 - LIS624: 230Vac;
LIS424M - LIS624M: 125Vac
LG
Garage light (max. 2,300W resistive)
LIS424 - LIS624: 230Vac;
LIS424M - LIS624M: 125Vac
ANT
Antenna connection
R.E
Plug-in receiver

Publicité

Table des Matières
loading

Table des Matières