INSTALLATION
1
TOOLS AND MATERIALS
Set of screwdrivers
Spanner 17mm
Allen key 4mm
Marker pencil
2
INITIAL CONDITIONS AND CHECKS
Initial conditions of the gate
Check that the size of the gate is within the
admissible range of the actuator (see the
technical characteristics of the actuator).
If the gate to be automated has a passage gate,
use a safety device to prevent the actuator
from operating with the passage gate open.
The gate must have a closing stopper and an
opening stopper.
Environmental conditions
This device is not suitable for installation in
inflammable or explosive environments.
Electrical power supply installation
Ensure the power supply installation fulfils the
following requirements:
• The nominal voltage of the installation must
coincide with that of the control panel.
• The installation must be able to support the
power consumed by all the automatic
operation devices.
• The installation must be earthed.
Level
Tape measure
Underground electrical cable ducts
The gate must be easy to manipulate manually,
namely:
• It must be balanced, in order to ensure the effort
made by the motor is minimum.
• There should be no stiffness throughout its travel.
Do not install the actuator in a gate which does
not work correctly in manual operation, as this
may lead to accidents. Repair the gate before
installing.
Check that the admissible environmental
temperature range for the actuator is suitable
for the location.
• The electrical installation must comply with
low voltage regulations.
• The installation elements must be properly
secured and in a good state of conservation.
If the electrical installation does not comply
with the foregoing requirements, repair before
installing the automatic operation device.
English
LINCE actuator for sliding gates
49