Télécharger Imprimer la page

Rohde ST 310 Mode D'emploi page 83

Masquer les pouces Voir aussi pour ST 310:

Publicité

Step
Action
8
Reinstall the fuse and carrier in reverse order.
Reconnect the connection cable of the control system
9
to the kiln.
10
Turn on the kiln.
11
Turn on the control unit.
12
Check the control system works.
10. Parameter configuration
10.1.
General description
By changing the available parameters, the controller can be adapted to your individual requirements.
10.2.
Available parameters
Parameter
Function
Number
14
Kiln output in kW
16
Control mode*
Logging interval data
50
on USB in s
Temperature display in
60
°C or °F
*
1
With solar-ready control ("Hysteresis"), the heating of the kiln is switched on for at least 30 seconds per heating cycle. As a
result, the electricity from the PV system is used optimally and any storage battery of the photovoltaic system is used more gently
by the kiln.
Min.
value
0
0
1
5
0
81 / 384 - EN -
Remark
Tool:
7 mm slotted screwdriver
Set the main switch on the kiln to the
"I/ON" position and/or plug in the power
plug.
If the control unit still cannot be switched
on, contact a qualified electrician, the local
specialist or the manufacturer.
Max.
Default
Value
setting
9999
0
1
0
300
60
1
0
Description of the value
1 unit = 0.1 kW
E.g.:
For a kiln with 10 kW power
(see kiln nameplate), enter the
value "100" here.
0 = PID
1 = Solar Ready (Hysteresis)
1 unit = 1 s (second)
0 =°C
1 = °F

Publicité

loading