Appendix A: Installation protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if
the item has been performed or considered.
NOTE!
If a value is outside the limit or a result is incorrect or missing, this is
to be rectified before the initial start-up and normal operation.
Correct limits or results are given within brackets.
E-PAK DX No.
Date:
Performed by:
Control items
Application requirements (limits)
Installation area classification
Material MIE (>3 mJ)
Material MIT (>205 ºC)
Material Kst: See the product identification plate.
Material Pmax: See the product identification plate.
Material chemical/thermal reaction risk
Radiation heat from surroundings
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Traction forces (1.5 kN horizontally, 3.5 kN vertically)
Total weight (209/250/335 kg (460.8/551.2/734 lb))
Anchor bolts (Hilti HDA-PF 20-M10×100/20)
Flame and pressure risk area clear
Access for maintenance/filter replacement (1 m above unit)
Mounting (check availability)
Maintenance switch
Installation room, ventilation openings
Antistatic plastic bag
E-PAK 150 DX/300 DX/500 DX