Installation: Connecting the compressed air
Important
Important
4.3
20
The pneumatic hose (blue hose) must be inserted in the blue marked con-
nection (on the left side at the bottom of the connection panel, see Illustra-
tion 3). It may not be inserted in the stainless steel connection, since the
machine doesn't start without compressed air!
M 3. Check the displayed air pressure value on the manometer. If the
pressure is not between 7 and 8 bar, reset the pressure value (see
chapter 4.3.2).
M 4. Connect the CAM computer to the machine via the USB connection.
M 5. Put the vacuum hose with the hose connection in the air extraction
connection at the side of the machine (see also chapter 4.4).
M 6. Connect the power cord to the machine.
M 7. Plug the machine's power cord in a separately fused circuit current or
ensure that no devices are connected that cause heavy voltage fluctu-
ation when switched on (e.g. air compressor etc.).
M 8. Close the working chamber door.
M 9. Start the machine with the main power switch.
Connecting the compressed air
The spindle SFS 300P needs a pneumatic connection. The spindle uses the
compressed air to control the collet chuck during the automatic tool change.
It is also used to produce sealing air, that prevents dirt from entering into the
spindle. The air consumption of the machine is 80 litres per minute.
The scope of delivery contains a service unit for the compressed air supply.
You can use it to regulate the incoming compressed air to the machine. The
built-in water separator containing a filter element prevents moisture or dirt
from getting into the machine.
Original Instructions: S2 Impression
Document version: F – 07/2019