Télécharger Imprimer la page

SICE S 100 PL Manuel D'instructions page 80

Publicité

Les langues disponibles
  • FR

Les langues disponibles

- Turn the clamping device anticlockwise
to release it from the turntable (C).
- Remove the device from the rim (D).
- Lower the wheel lifter (pedal 29) and
position the wheel on it by hand (A).
- Lower the lifter (pedal 29) (B).
- Remove the wheel from the lifter.
80
APPROVED M/D PROCEDURE
FOR UHP AND RUN FLAT
For the detailed M/D procedure for UHP
and RUN FLAT tyres, please refer to the
instruction manual wrote by WDK (German
Association of the Tyre Industry)
MOUNTING PROCEDURE
- A variation of the mounting procedure
explained above may be adopted in case
of rims with very small or non-existent
drop centre (fig.11-B). In these exceptional
cases, the mounting procedure can be
facilitated by using a variant of the normal
procedure.
- The first bead is mounted in the usual
way. To mount the second bead, position
the movable tool as when approaching for
demounting (fig. 32).
29
- This reduces the stresses, leaving more
space for the tyre. The following opera-
tions, illustrated from fig. 28 on, remain
31
unchanged.
TYRES
"EXTRAORDINARY"
User Manual S 100 PL
32

Publicité

loading