Télécharger Imprimer la page

SICE S 100 PL Manuel D'instructions page 74

Publicité

Les langues disponibles
  • FR

Les langues disponibles

- Preload the bead breaker disc using con-
trol 23 (a tyre crushing preload of about 5
mm is advisable).
- Activate disc penetration (control 26) and
then start wheel spinning (pedal control
15), while lowering the bead breaker disc
a little at a time (control 23).
- Perform at least one complete spin to fully
break the bead. The rim bead should be
greased during the spin.
- Set the upper arm downwards below the
wheel with (control 23)
74
18
- Move the column forward (pedal 13)
- Make the head (3) go down on the rim
(push-button 9)
- For correct tool positioning, the insert (G)
must be at the end position with the rim
edge (C), where the vertical wall begins.
- Press the block 9 to fix the tool (3) position.
A
B
C
User Manual S 100 PL
19

Publicité

loading