Télécharger Imprimer la page

SICE S 100 PL Manuel D'instructions page 52

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Remove the upper part of the packing.
The machine is fully assembled, comprising
two main groups, 2- the machine, 3- the ac-
cessories, (fig. 1).
Identify the points 4 and 5 at which the ma-
chine is anchored to the pallet and proceed
to remove fixing devices. (fig. 1)
HOISTING/HANDLING
In order to remove the machine from the pallet,
hook it up as shown in fig. 2.
This hoisting point must be used whenever
you need to change the installation position
of the machine. Do not attempt to move the
machine until it has been disconnected from
the electricity and compressed air supply
systems.
52
INSTALLATION CLEARANCES
WARNING
The installation site must be chosen in strict
compliance with the relevant regulations
regarding Safety in the workplace.
IMPORTANT: for correct, safe use of the
equipment, users must ensure a lighting level
of at least 300 lux in the place of use.
CAUTION
If the machine is installed outdoors, it must
be properly sheltered under a roof.
WARNING
The floor must be able to withstand a
load equal to the sum of the weight of the
equipment itself and the maximum payload,
bearing in mind the support surface area and
eventual anchor fixtures used.
Install the tyre changer in the chosen work
position, complying with the minimum clea-
rances shown in fig. 3.
The machine must be placed on a horizontal
surface, preferably concrete or tiled floor. Do
not install on unstable or damaged surfaces.
1200
2
The surface on which the machine rests must
500
3
User Manual S 100 PL

Publicité

loading