4. To lower the pole, turn the latch (C) clockwise until the telescoping portion (A) lowers into the bottom tube (Figure 14).
5. Lift up and pivot the pole down into the storage position.
P P o o s s i i t t i i o o n n i i n n g g t t h h e e r r e e m m o o v v a a b b l l e e I I V V p p o o l l e e ( ( o o p p t t i i o o n n ) )
C C A A U U T T I I O O N N - - Do not load the IV pole above the safe working load of 40 lb (18 kg).
1. Install the pole at any of the four receptacles of the litter, located on all four corners of the frame.
2. To raise the height of the pole, turn the knob (A) counterclockwise and pull up on the telescoping portion (B) of the pole
(Figure 15).
3. Turn the knob (A) clockwise to tighten the telescoping portion (B) in place (Figure 15).
4. To lower the height of the pole, turn the knob (A) counterclockwise and lower the telescoping portion (B) of the pole into
the bottom tube (Figure 15).
EN
22
B
F F i i g g u u r r e e 1 1 4 4 – – T T w w o o - - s s t t a a g g e e I I V V p p o o l l e e
A
C
3005-009-005 Rev AA.1