Télécharger Imprimer la page

ROBBE Happy Hunter Notice De Montage Et De Mise En Œuvre page 32

Publicité

Les langues disponibles

Les langues disponibles

- Sand the stern bulwark and the hull sides flush with the
handrails, and round off the handrails on the inside - Fig.
62.
- The next stage is to trim the bulwark stanchions 85 - 91
to fit, and glue them in place. It is best to break out the
parts only as they are required, as this helps to avoid con-
fusing them. The bulwark stanchions which are not loca-
ted in front of the scuppers should be bevelled on the
right-angled side: see the view entitled "Hawser bar".
- Glue the individual stanchions in place as shown in the
plan view on Plan I - Fig. 63.
- Trim the large oil cradles 92, 93 and the small oil cradles
94, 95 to fit and glue them in place - Fig. 65.
- Trim the roller 96 to fit in the roller box, and glue it in place.
Sand the roller fairings 97 to final shape, trim them to fit
accurately (no gaps) and glue them on both sides - Figs.
66, 67.
Assembling the crane
Part
Description
No.
1 K
R.H. crane outrigger
2 K
L.H. crane outrigger
3 K
Outrigger pulley
4 K
Hydraulic ram
5 K
Idler drum
6 K
Spigot
7 K
Rear bar
8 K
Centre bar
9 K
Front bar
10 K
Hydraulic cylinder
11 K
Guide tube
12 K
R.H. crane post
13 K
L.H. crane post
14 K
Vent pipe
15 K
Hydraulic motor
16 K
Operator's stand
17 K
Operator's desk
18 K
Ladder
19 K
Crane pulley
20 K
Hook
21 K
R.H. hook block
22 K
L.H. hook block
23 K
Drum
24 K
Crane column
25 K
Crane plinth
26 K
Washer
27 K
Collet
28 K
Grubscrew with cutter tip
104
Guide tube
105
Bevel gear
106
Grubscrew with cutter tip
- Refer to the detail drawing on Plan I and photos 73 - 85.
The crane should be assembled following the sequence
of the part numbers.
- Parts 3 K - 5 K must be free to move.
- Glue the guide tube 104 to the top end of the tube 11 K
Assembly instructions
Happy Hunter
The main deck
- Place the coamings 99 and 100 in the main deck 98 from
the underside. Note that the rear coaming 99 should be
fitted leaving a 2.5 mm gap to the rear edge of the deck.
Glue the coamings in place.
- Cut out the openings in the coamings when the glue has
set hard.
- Attach the reinforcing rails 102 to the foreship bulkhead,
and glue it to the top of the deck, maintaining the 2 mm
clearance - Figs. 69 - 71.
- Cut the deck girders 103 to length and tack them to the
hull step by step. The girders must fit exactly between the
marked points for the stringers, which will be fitted later.
Take care to keep everything symmetrical on both sides.
- Fit the main deck and trim it to fit, but don't glue it in
place; it is not installed permanently until the mechanical
systems for the auxiliary working systems have been fit-
ted - Fig. 72.
- Drill the 6 mm Ø holes at the marked points in the hull
sides for the portholes 377.
Material
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
Brass
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
ABS
Brass
Brass
Steel
Brass
Brass
Steel
only; take care to cut the tube to the correct length.
- Glue the tube 11 K in the right-hand crane post 12 K.
Assemble the crane outrigger 1 K - 9 K, place it in the
right-hand crane post, and glue the left-hand crane post
13 K on top.
- Install parts 14 K - 18 K as shown in photo 79.
32
Size in mm
No.
off
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
4 O.D. x 75
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
Inj. Moulded
1
4.3 Ø x 9 Ø
1
4 I.D.
1
M3 x 3
1
1 Ø x 0.6 Ø x 80
1
11.2 Ø
1
M3 x 3
2
Order No.
1106
Notes
FS
FS

Publicité

loading

Ce manuel est également adapté pour:

1106