CONNECTING TO THE POWER SUPPLY
4
For your safety, these operations must be carried out with the power supply switched off.
• Connect phase and neutral to terminals 16 and 17 (red
"230 V" label on the electronics)
• Lock the 230 V power supply cable with the cable clamp
provided.
• Fit a terminal block on the earth wire (yellow/green) and
store it in the control unit.
COMMISSIONING
5
5.1 Switching the installation on
The indicator light
flashes (twice).
The motor is switched on and awaiting auto-programming.
If the indicator light
does not come on or the number of flashes is not as expected: see diagnostic page 16.
5.2 Memorising the remote controls
1
If indicator light
is not lit, press button
the control electronics for 2 seconds.
The indicator light
comes on.
5.3 Auto-programming the gate leaves' travel
Prerequisites:
• Check that
the installation is switched on: indicator light
flashes (2 flashes).
• The gate must be closed.
1.
Press button 1 on the remote control to initiate a COM-
PLETE opening motion of the gate. The leaves open one
a er the other.
2.
When the gate is completely open, press button
remote control again to launch a
of the gate.
3.
Press button 1 on the remote control to initiate a COM-
PLETE opening motion of the gate. The leaves open with a
slight delay.
4.
When the gate is completely open, press button
remote control again to launch a
of the gate.
When the gate is completely closed, the
on the control unit should be CONTINUOUSLY LIT.
8
EN - Replacing the EXAVIA 500 / WISPA 800 / SGS 201SGS 400 / SGS 501 electronic unit - SOMFY
2
>2s
Position the new remote control to be
on
programmed on the control electronics target.
1 on the
FULL closing movement
1 on the
FULL closing movement
indicator light
Cable clamp
3
Briefly press the button on the remote control
to be programmed. The RADIO indicator light
will come on then go out when you release the
button on the remote control.
Complete opening is programmed on this
button.
1
2
3
4
Live
Neutral
230 V power supply cable
<0,5s