Hoisting/Handling - Corghi Artiglio Master J Manuel D'utilisation

Masquer les pouces Voir aussi pour Artiglio Master J:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

A
D
F
B-C
E
5

3.1. HOISTING/HANDLING

To lift the machine from the pallet, remove the
screws from the fixing feet (A, Fig. 6) and secure it
using the hoisting bracket (B, Fig. 6).
This hoisting point must be used whenever you
A
need to change the installation position of the
machine. Do not attempt to move the machine
until it has been disconnected from the electricity
and compressed air supply systems.
B
EN
6
Artiglio Master J Operator manual
111

Publicité

Table des Matières
loading

Table des Matières