DAB 1 KDN Instructions Pour L'installation Et La Maintenance page 43

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
FIRE-FIGHTING SET TO STANDARD EN 12845 – UNI 10779
1 Diesel Motor Pump + 1 KDN Electropump + Pilot Pump
Main Electropump
WHEN THE SET IS SUPPLIED, THE PUMP BODY DRAINAGE CAP IS UNSCREWED!
P1 Electropump
P2 Diesel Motor Pump
P3 Pilot Pump
1
Pilot Pump electric panel
2
Electropump electric panel
Pressure switches for starting pump
3
4
Check valve
5
Manual start valve
6
Eccentric suction pipe (OPTIONAL)
7
Regulating feet
(may be fixed to the ground)
8
1/2" connection – check valve test
ENGLISH
9a
THE DRAINAGE CAP IS IN THE BAG ATTACHED TO THE SET!
ATTENTION!
9
Pump air and recirculating vent 3/8"
2" connection
10
to be connected to the bottom of the priming tank
11 Diesel Motor Pump electric panel
12 Delivery manifold
Manifold joining the
13
Diesel Motor Pump to the Electropump
14 Diesel Motor Pump tank
15 Diesel Motor Pump starting batteries
16 Diesel Motor
17 Vibration-damping coupling
18 Pump running pressure switch
19 Base (may be fixed to the ground)
38
Pilot Electropump

Publicité

Table des Matières
loading

Table des Matières