Percutaneous Leads Directions for Use
4. Suture the sleeve to the supraspinous ligament or deep fascia through the suture sleeve holes.
5. Tie multiple sutures as tightly as possible around the suture sleeve to secure it to the lead.
CAUTION: Tightening sutures directly on the lead can damage the lead.
6. For Permanent Trials, proceed to "Tunneling the Lead or Lead Extension" on page 14.
7. For permanent IPG implantation, proceed to the IPG Implantation instructions as follows:
SCS System
Precision SCS System
Precision SCS System with
MultiWave Technology
Precision Spectra SCS System
Precision Novi SCS System
Tunneling the Lead or Lead Extension
1. Attach the tunneling tool handle to the shaft by turning the locking mechanism clockwise.
Tool Handle
Locking Mechanism
2. Mark the desired route of the tunnel.
Percutaneous Leads Directions for Use
90970887-03 Rev A
14 of 441
Reference Document for instructions
Precision Spinal Cord Stimulator Clinician Manual
Precision Spinal Cord Stimulator System with MultiWave
Technology Clinician Manual
Precision Spectra IPG DFU
Precision Novi IPG DFU
Shaft
Section Title
"IPG Implantation"
"IPG Implantation"
"IPG Implantation"
"IPG Implantation"