Operation
8. Operation
1. Safety check
General information
Readiness for use
2. Switching on
Preparatory work
Operation
Control panel
Drilling hole line with interchangeable drilling unit,
9 spindles
Inserting hinges
3. Malfunctions during operation
Troubleshooting
4. Checks during operations
Checks for proper working order
148
1. Safety check
Caution!
This machine must only be operated and serviced by
148
skilled personnel who have been authorised or trained
148
to do so. Always observe the safety precautions and
internal safety rules.
148
Before switching the machine on, satisfy yourself that
149
• any installation, set-up and servicing work have been
149
completed in full,
149
• no persons are present in the danger zone, let alone
150
working on it,
• all safety guards must be fitted in the prescribed way, and
151
• the compressed-air supply is ready for operation.
152
General information
153
Before commencing production:
153
• Make sure the machine is safe and in proper working order
153
before and after you switch it on.
153
Make sure the compressed-air supply is ready for operation.
Make sure the machine has been set up for the relevant
product.
Note:
Immediately inform your line manager of machine
malfunctions or faults.
Readiness for use
The machine is ready for operation if
• all of the above-stated activation processes have been
carried out.
• a trial run has been carried out,
• the compressed-air supply is activated, and
• the machine is set up for the relevant product.
Production can now commence.