5. Main te nance

5.1

Gen eral notes

Care ful main te nance:
In creased ser vice life.
In creased func tion.
Re duced downtimes.
In creased re li abil ity.
Re duced re pair costs.
Ob serve the safety reg u la tions!
Main te nance works should only be car ried out when the
en gine is shut off.
The en gine and ma chine should be cleaned thorougly be -
fore car ry ing out main te nance work.
Park the ma chine on a flat sur face and se cure it against
roll ing away and slip ping.
En sure that op er at ing ma te ri als and re placed parts are
dis posed of safely and in an en vi ron men tally - friendly
way.
5.2 Main te nance sched ule (HATZ =
Works
Clean ma chine
1)
Check en gine oil level
1)
Change en gine oil
1)
Check the wa ter trap
1)
Clean en gine oil fil ter
1)
Clean fuel fil ter
1)
Change fuel fil ter
1)
Check air fil ter
2)
Change air fil ter el e ment
1)
Check valve clear ance
Ex citer: Check oil level
2)
Ex citer: Change oil
Check hy drau lic oil level
Change hy drau lic oil
Check the hy drau lic hose lines
Check rub ber buff ers
Check V-belt
Check screwed con nec tions for tight -
ness
1)
See en gine op er at ing man ual
2)
Min i mum once a year
3)
For the first time
In ter vals
Daily
20 h
3)
2)
Be fore com menc ing work on any elec tri cal equip ment,
dis con nect the bat tery and cover it with in su lat ing ma te -
ri als.
Do not con fuse «PLUS» and «MINUS» poles on the bat -
tery.
It is es sen tial that short-cir cuits be pre vented in ca bles
car ry ing cur rent.
Burn-out lightbulbs in in di ca tor lamps should be re -
placed im me di ately.
When clean ing the ma chine with a high-pres sure wa ter
jet, do not spray the elec tri cal com po nents di rectly.
Af ter wash ing the com po nents, blow-dry them with com -
pressed air in or der to pre vent sur face leak age cur rent
and cor ro sion.
When car ry ing out weld ing work on the en gine or ma -
chine,earth the weld ing in stru ment as close as pos si ble
to the weld ing point and dis con nect the bat tery.
/ Hon da = )
50 h
100 h
3)
3)
3)
3)
78
200 h
250 h
400 h
If nec es -
sary
(
)