PANEL INSTALLATIoN
The installation into a boiler panel cutout is carried out in the following way:
1. Unscrew both screws (a) from controller (b) and remove it from the base (c).
2. Cut the opening 205 x 92 mm in the panel.
3. Knock out both cable inlet lids from the base. Left inlet is for sensors, right inlet is for
power supply cables. Put the base (c) into the panel cut out and fasten it with the inte
grated hooks (e).
4. Carry out electrical connection, put the controller (b) back to the base and fasten it with
the screws (a).
Installation manual
68