Electrical Connections; Connection Cables Section; Arrangement Of The Cables And Insertion Of The Ferrite Toroids - Gtec SATURN Serie Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour SATURN Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

E
LECTRICAL CONNECTIONS
C
ONNECTION CABLES SECTION
Refer to the following table for the sizing of input, output and battery cables:
network / separate bypass (optional)
kVA
PE
60
25
80
35
100
50
125
50
(1)
The sections contained in the table refer to a maximum length of 10 m (cable type N07V-K in clear air)
(2)
The maximum length of the connection cables to the Battery Box is 10 metres
(3)
In the case of non-linear loads, oversize neutral line N by 1.7 times the phase line
Note 60KVA: the maximum section of the cables that can be inserted in the terminal board is equal to 50 mm2 (flexible and rigid
cables)
80KVA: the maximum section of the cables that can be inserted in the terminal board is equal to 95 mm2 (flexible and rigid
cables)
100KVA : the maximum cross-section of the cables to insert into the terminals is 95 mm² for the PHASES and 150 mm²
for the batteries (flexible and rigid cables).
125KVA: the cables must be fitted with crimp headers for M8 bolts.
A
RRANGEMENT OF THE CABLES AND INSERTION OF THE FERRITE TOROIDS
It is recommended to wire the power cables routing them from the back, under the UPS, to the front of the machine, ensuring they
come up in the terminal area.
Insert the ferrite toroids supplied as shown below (NOTE: ferrites cannot be fitted to the 125)
 Insert 3 toroids into the cable bundle [L1, L2, L3, N] INPUT
 Insert 3 toroids into the cable bundle [L1, L2, L3, N] OUTPUT.
 Arrange the cables so that the toroids are positioned under the
base of the UPS or close to it.
INPUT
L1/L2/L3
N
(3)
35
35
50
50
70
70
95
95
60KVA
(1)
Sezione cavi (mmq)
OUTPUT
PE
L1/L2/L3
N
25
35
35
50
50
70
50
95
 Insert 4 toroids into the cable bundle [L1, L2, L3, N] INPUT.
 Insert 4 toroids into the cable bundle [L1, L2, L3, N] OUTPUT.
 Arrange the cables so that the toroids are positioned under the
base of the UPS or close to it.
- 73 -
EXTERNAL BATTERY
(3)
PE
+/-
35
25
50
50
35
70
70
50
120
95
50
150
80 – 100KVA
(2)
N
50
70
120
150

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Saturn 60Saturn 80Saturn 100Saturn 125

Table des Matières