Hookup Instructions - Gtec SATURN Serie Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour SATURN Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

H
OOKUP INSTRUCTIONS
Follow the instructions below in order:
open the door
Depending on model: remove the terminal/bar cover (see "Switches view")
125KVA: to remove the bar cover, first remove the handles of the
SWIN, SWOUT, SWBYP and SWMB switches by undoing their screws
as shown in the image.
connect the protective conductor (ground cable) to the PE marked screw.
Depending on model: connect the input, bypass (if present), output and battery cables to the terminals/bars; follow the
hookup indications in "UPS connections view". Connect the N BATT, N INPUT, N BYPASS (if present) and N OUTPUT
cables to the neutral bar.
Note: PE M6 screw, N M8 screw
The input and bypass Neutral must always be connected.
The input and bypass lines must be connected to the same potential as of the Neutral.
Once you have completed the installation and checked the connections (see "First power on and initial settings"), restore
the terminal/bar cover.
125kVA: Restore the switch handles.
Close the door.
Once installation operations have been completed and connections verified (see paragraph "First start-up and initial settings"),
restore the terminal cover panel and close the door.
Example image (purely illustrative)
- 75 -

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Saturn 60Saturn 80Saturn 100Saturn 125

Table des Matières