INSTALLATION
Alternative installation methods
24
18 Nm
f Fit water plugs with gaskets to seal the concealed connec-
f
tions. All taps obtained as accessories are supplied with
plugs and gaskets in the standard delivery. For pressure taps
other than those recommended by us, plugs and gaskets can
be ordered as accessories.
f Fit a suitable pressure tap.
f
f Push the lower back panel section under the connection
f
pipes of the tap and push it into the back panel.
f Secure the connection pipes to the tee and the 3-way ball
f
shut-off valve.
Note
You can break off the pipe fitting tabs on the lower back
panel section if required.
www.stiebel-eltron.com
19
5 Nm
1 Tab
14.6 Water installation on finished walls with
You can connect copper or plastic pipes using the accessories
"solder fitting" or "press-fit fitting".
With "solder fitting" with threaded fitting for 12 mm copper pipes,
proceed as follows:
f Push the union nuts over the connection pipes.
f
f Solder the inserts to the copper pipes.
f
f Push the lower back panel section under the connection
f
pipes of the tap and push it into the back panel.
f Secure the connection pipes to the tee and the 3-way ball
f
shut-off valve.
1
solder/press-fit fittings
Note
Observe the tap manufacturer's instructions.
DHE Connect | DHE Touch |
105